Released in September 2025
Here you'll find the latest news, improvements and patches for our Robin platform.
We're very proud of them, and hope you enjoy them as much as we do!
- All widgets are now automatically refreshed every 5 minutes.
- Widgets also update in real time when an asset is added or modified via a form or table.
- Ideal for dashboards displayed on TV screens to ensure that information is always up to date. It's also very useful for avoiding the need to refresh the web page after each entry in a form, in order to immediately see the new assets appear in the table.
-
Tasks
- Added priority, work duration and quantity produced/worked tracking.
- Resources not available at the time of the task appear in red.
- Task progress is shown as a gauge on the Gantt chart.
-
KPIs
- Displays OTD, delays, lead times and conflict rates.
- Easy visualization of the impact of changes on KPIs.
-
Search and filters
- Enhanced filtering to display only relevant information.

- Key information added directly to alert emails: no need to log in to get the essentials. It is also possible to configure which fields should appear in the detail table included in the email.

Robin 2025.5 features full of other new features that are exciting:
- Customized logo integration (fee-based option to be discussed with your sales representative)
- New "last position date" indicator for IoT fields.
- Alphanumeric sorting for text breakdowns on KPIs.
- Asset archiving option in the "Unpair device" form.
- Faster loading of the history widget.
- You can now configure recurring business rules with a frequency greater than 1 hour, for example 1 day or 1 week.
Did you spot a bug too? Feel free to report it to support@zozio.tech !
Here is the list of fixes applied to this version:
- Locking of asset type modification in the KPI editor to avoid crashes.
- Corrected display of KPI evolution widget in rare cases.
- Disappear widget assets with conditions if the new value no longer respects the conditions.
- Retention of unsaved dashboard layout when adding a widget.
- Removed erroneous message prompting selection of a field in the map/table editor.
- Removal of white background behind alerts/filters.
- Restores focus on the input in coding-system mode form after the first entry.
- Corrected an error in the generation of email alerts that could lead to the receipt of duplicate (or more) emails.
Here you'll find all the latest news, improvements and fixes for our IoT hub.
We're very proud of them, and hope you enjoy them as much as we do!
- Integration of a new BLE geolocation mode in ESLs via Wizzilab's Dash7 anchors.
- This method complements the geolocation already supported by Quuppa (see release 2025.2).
- The system is based on BLE triangulation via fixed anchors, and enables the position of moving objects to be estimated simply and cost-effectively. Unlike Quuppa technology, this is a lightweight, non-wired, battery-powered infrastructure, so it's easily upgradeable, but with a lower level of precision.

Safety is a key expectation of our customers, and Zozio is keen to be at the forefront of this field. In this context, our annual pentest was carried out this summer on our applications, and the associated patches have been integrated into this version.
Several issues have been identified and corrected, including insecure redirects, overly explicit error messages, and missing protection on certain forms or actions. All these elements have been assessed as presenting a low to intermediate level of risk. Thanks to the patches applied, the platform is now even more robust and secure, with no perceptible change for the end user.