Released in May 2026
Here you can find the new features ✨, improvements, and bug fixes 🐞 for our Robin platform.
We are very proud of them 💪 and hope you like them as much as we do 😄!
Gantt keeps evolving 🚀 with two major improvements in this version:
The due dates are now displayed directly on the Gantt chart using a diamond icon 🔷, so you can see your order deadlines at a glance.

On the performance side ⚡️, we stepped things up! Gantt loading is much smoother, with a significant reduction in loading and editing times. No more waiting times ☕!
Organize your dashboards however you want 🗂! It is now possible to group your dashboards into folders to keep things clearer and find what you need more easily. Ideal for environments with many dashboards 🖥.

Two new system fields are now available to better manage your PDI ESL labels:
- PDI ESL Status : displays the refresh status of your ESL in real time.
- PDI ESL Status date : indicates the date of the last ESL status refresh.
These fields provide precise tracking of the state of your connected equipment ✅.
The KPI engine now includes a new time breakdown option 📅. You can now break down your indicators by day, week, month, or year, but also according to a custom schedule. For example, by shift 🔄. New flexibility for analyzing your data over a specific period 🔍.
Robin 2026.3 is full of small and big everyday improvements 🎁:
- Settings : the number of displayed rows is now saved and applied automatically when the page reloads ⚙️.
- Browser tab : the page name is now displayed in the browser tab, making it easier to find your way around when many tabs are open 😅.
- Table/history widget : headers are now displayed on two lines, which reduces column width without losing content 📏.
- Field selector : you can now see the description of a field and perform a search by field identifier 🔎.
- Color selector : a brand-new color picker with predefined color palettes 🎨 for a more ergonomic experience.
- History widget ⏱ :
- Improved loading time : pages load one by one, making the experience smoother ⏳.
- New export module that can handle exports over long periods without trouble 📤.
- Super Admin : sector, KPI, and alert identifiers are now directly visible in the interface, no more digging around 🔍.
Have you also spotted a bug? 🐛 Feel free to report it to support@zozio.tech!
Here is the list of fixes applied in this version 🔧:
- Gantt widget :
- Fixed the display of stock shortages that were not shown ⚠️.
- Fixed tooltip display in full-screen mode 💬.
- Fixed a random widget freeze 🥶.
- Resources tab: fixed a task that sometimes disappeared on refresh.
- Fix: sorting is no longer lost during editing 🔢.
- Fix: removed color coding on completed tasks due to inconsistency between KPIs and color coding 🎨.
- Form widget : focus did not return to the "asset to edit" field after an action 📝.
- Map : fixed zoom behavior when searching from the asset location map/table view
.
- Search : removed fuzzy search 🔍: only assets with exact matching characters are displayed.
- ESL : fixed the ESL unpairing issue on Sepioo when changing the ESL on an asset.
- EnumV2 : fixed the inability to define a legend color 🎨 and delete an existing default value 🗑.
- Formula : fixed formula calculations using
archive_date before asset archiving 📋.
Here you'll find all the latest news, improvements and fixes for our IoT hub.
We're very proud of them, and hope you enjoy them as much as we do!
It is now possible to follow the PDI ESL status directly from MAMS. You can view the refresh status of your ESL labels in real time, as well as the date of the last refresh, for finer control of your connected devices ✅.
Have you also spotted a bug? Feel free to report it to support@zozio.tech !
Find here the list of patches applied on this version :
- ESL PDI : corrected the display of certain events (logs) that were not appearing 📋.